Case Study – Copperhead Ales, Totnes

We were recently asked to work on a flooring project for a local Totnes brewery.  The project involved installing stainless steel drainage and a polyurethane screed flooring to their taproom.

The work involved breaking out the existing 200mm thick concrete floor and installing a stainless-steel drainage channel linked to an existing drainage outlet. 

For the floor in the brewing area, we prepared the floor using dust extracted diamond grinding and installed a tough, durable, and hygienic, 9mm heavy duty polyurethane screed.

At the front of taproom, a high build epoxy coating with anti-slip finish was installed.

The project took approx. 2 weeks to complete including all curing.

We look forward to the taproom opening for business this summer!